Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 05, 2008     Rudder pedals - (1.7 hours)       Category: Fuselage
I managed to sneak into the workshop and actually get some work done!

I attached the rudder pedal slider bar (WD-818 and WD-817) to the floor and firewall. This was greatly complicated by the fact that the pre-installed nutplates seemed to have a mind of their own and did not accept the AN-3 bolts with anything resembling enthusiasm. I finally got it done with some Boelube and the help of a buddy. I think these nutplates will have to get a tap run through them before final assembly. I then drilled the attach bolt holes through the shaft of the slider bar and the weldment.

Next, I began test-fitting my Matco MC-5 brake master cylinders to the pedal assembly. The design of the integrated brake reservoir might mean that if I use them, I'll have to modify the attach-tabs on the WD-816 weldment. Either that, or I'll make a spacer and use a longer bolt. Not sure yet.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.